NHI THANH WATER TREATMENT PLANT - PHASE III, CAPACITY EXPANSION TO 120,000 M³/DAYDomestic projects
DB Engineering PROJECT

NHI THANH WATER TREATMENT PLANT - PHASE III, CAPACITY EXPANSION TO 120,000 M³/DAY

DB Engineering supplies AVK valves and XINXING ductile iron pipes for the process system and pipeline network of the Phase III expansion of Nhi Thanh Water Treatment Plant to 120,000 m³/day.

Client / plantBIWASE - Long An Water Joint Stock Company
LocationLong An
Capacity120,000 m³/day
Year / period2024-2025
OVERVIEW

Project story & delivery scope

01
PROJECT STORYProject overview

DB Engineering supplies AVK valves and XINXING ductile iron pipes for the process system and pipeline network of the Phase III expansion of Nhi Thanh Water Treatment Plant to 120,000 m³/day.

DB Engineering scope

  • Supply of AVK valve equipment.
  • Supply of XINXING ductile iron pipes.
  • Installation and operation guidance for the plant process system and pipeline network.