MAJOR INTERNATIONAL TRANS-ANATOLIAN PIPELINE PROJECT THROUGH TURKEY ↗
The trans-Anatolian natural-gas pipeline project uses AVK UL/FM fire-protection solutions at compressor and metering stations delivered within Tekfen's project scope.
The trans-Anatolian natural-gas pipeline project uses AVK UL/FM fire-protection solutions at compressor and metering stations delivered within Tekfen's project scope.
On 22 July 2022 in Da Nang City, the Central Vietnam - Central Highlands Water Supply and Sewerage Branch held its 11th Congress for the 2022-2024 term.
Two projects in China and India use large-diameter AVK valves to improve the reliability and safety of clean-water supply systems.
There is no single check-valve design that is best for every application. Correct selection of valve type, size and specification is essential for smooth, reliable and long-term system operation.
A wastewater treatment and transmission upgrade in Jiaxing uses large AVK gate valves, including a DN2200 unit standing more than seven metres high.
As 2021 drew to a close, AVK Vietnam looked back on an 80-year journey and expressed its gratitude to customers, partners, distributors and employees who contributed to the AVK Group's development.
Eight major leaks on the DN3000 Adduttore Sinni pipeline in southern Italy were repaired using purpose-designed Hydro Stop socket encapsulation collars.
An optimized high-rise water-pressure boosting design can reduce excessive pressure and energy waste. A zoned booster solution can match pressure to demand in each zone and improve system efficiency.
DB Engineering supplied AVK valves and provided installation and operation guidance for the Ho Da Den Water Treatment Plant expansion, adding 125,000 m³/day of capacity.
An overview of AUMA actuator and gearbox combinations, variable-speed solutions, multi-turn actuators, replacement models, accessories and integrated control options.
Phase II of Nhi Thanh Water Treatment Plant increases capacity to 60,000 m³/day and expands water-supply pipelines serving Long An Province.
The Ho Da Den Water Treatment Plant expansion adds 125,000 m³/day of capacity with an estimated investment of VND 259 billion and includes process tanks, filters, a clean-water reservoir, pumping station, sludge treatment and electrical works.